A system that runs flawlessly from day one

The same product will have two very different service lives depending on which team installs it. For us, installation is not the delivery of a product — it is the handover of a working system.

Installation

What happens on installation day?

  • The team is on site at the scheduled time and the work area is made safe
  • Frame, track and motor are installed in line with the manufacturer's instructions
  • The electrical connection is run and the limit and force settings are configured
  • Photocell, safety light curtain and emergency stop are tested one by one
  • User training is given and manual release is demonstrated hands-on
  • The commissioning report is signed and the area is handed over clean

We work without stopping your production

We set the installation plan together with you, choosing the day and time that least disrupts your shipping and production flow. Where necessary, we set up a temporary passageway to keep the line open. In facilities that run in shifts, we time the installation to coincide with shift changes.

What does the warranty cover?

All of our installations are covered by a two-year workmanship and installation warranty. The warranty covers faults caused by incorrect installation, settings that have drifted out of adjustment and connection problems. Misuse, impact damage and third-party intervention fall outside its scope.

HOW WE WORK

Four steps from request to handover

  1. 01

    Request

    Reach us by phone, WhatsApp or the form, and we will route your request to the right team.

  2. 02

    Survey / diagnosis

    For a new system we take the measurements; for an existing fault we diagnose it on site.

  3. 03

    Execution

    Installation, maintenance or repair is carried out on the planned day and time, without stopping production.

  4. 04

    Check & handover

    Safety devices are tested, user training is given and the area is handed over clean.

RELATED PRODUCTS

Products we most often work with in this service

All Products
Loading SystemsLoading Systems

Loading Systems

Ramps, dock shelters and dock equipment

An integrated system of loading ramp, dock shelter and dock equipment. It speeds up dispatch and protects goods from the weather.

View details
Roller Shutter SystemsSecurity

Roller Shutter Systems

Elegant on the shop front, secure in the warehouse

Roller shutters with polyurethane-filled or extruded slats: physical security outside working hours and a clean appearance during the day.

View details
FREQUENTLY ASKED QUESTIONS

About Installation

How long does installation take?

For a single door, installation is usually completed within one working day. On loading dock projects where the ramp, the dock shelter and the door are installed together, it can extend to a few days; we state the exact duration in the quote.

What should I prepare before installation?

After the site survey, we share the necessary preparations with you in writing. The most common ones are clearing the installation area, running the power supply line to a suitable point and having a level floor.

Will you install a door I bought from another company?

We assess this after inspecting the product. To be able to provide an installation warranty, we need access to the product's technical documentation and its original installation kit.

CONTACT

Let's get started with Installation

Tell us briefly about your situation; we'll bring in the right team with the solution that fits.